Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 26, 2019, 05:53 AM
  • 32 0163_32 0254_09252019_230327.mp4

Date
09/25/2019
W/O
787483
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P22508
Time
10:53 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7015
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
08
Purpose
Routine Assessment
Project
WO_787483_TV32016_SEP2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
32 0163
Downstream MH
32 0254
Dir. of Survey
Downstream
Length Surveyed
177.1 ft.
Total Length
177.1 ft.
Structural Index
4
Structural Quick
5F3F
Structural Rating
276
O&M Index
2
O&M Quick
412F
O&M Rating
72
Overall Index
3
Overall Quick
Overall Rating
348
Pipe schematic from manhole 32 0163 to 32 0254
MH: 32 0163MH: 32 0254downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 01630 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 AND 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start144.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start174.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish174.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish174.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish174.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish177.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 AND 3 O'CLOCK177.1 ft. AMH - Downstream Manhole, Survey Ends - 32 0254177.1 ft. MGO - General Observation - STOP LOG CONNECTION AT 12 O'CLOCK

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - STOP LOG CONNECTION AT 12 O'CLOCK

    177.1 ft. - General Observation - STOP LOG CONNECTION AT 12 O'CLOCK

Observations (15)

DistanceCodeObservation
0AMH32 0163
6.9SRV
0MGOACTIVE CONNECTION AT MH 9 AND 3 O'CLOCK
144.5SSS
174.1SSS
2DAGS
6.9SAP
0MWL
177.1MGOACTIVE CONNECTION AT MH 9 AND 3 O'CLOCK
174.1DAGS
177.1AMH32 0254
0MWM
174.1SRV
174.1SAP
177.1MGOSTOP LOG CONNECTION AT 12 O'CLOCK

Properties (6)

additional_info
SC378631
custom_field_two
2
customer
LACSD
datetime
2019-09-25T22:53:58-07:00
documentation
PRO PIPE
is_lateral_inspection
false