Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2019, 11:08 AM
  • B 1184_B 1183 _22072019_041754.mp4

Date
07/22/2019
W/O
776976
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01125
PipeID
P13504
Time
4:08 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6643
Sewer Name
B JOINT OUTFALL B - UNIT 6H
City
SOUTH PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_776976_TV16118_JUL2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
B 1184
Downstream MH
B 1183
Dir. of Survey
Downstream
Length Surveyed
261.6 ft.
Total Length
261.6 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
144
O&M Index
2
O&M Quick
2T00
O&M Rating
208
Overall Index
2
Overall Quick
Overall Rating
352
Pipe schematic from manhole B 1184 to B 1183
MH: B 1184MH: B 1183downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 11840 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MINERALS25.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start25.2 ft. H - Hole, at 02 o'clock, within 8 inches of joint: YES260.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish260.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish260.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish261.6 ft. AMH - Downstream Manhole, Survey Ends - B 1183

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start - MINERALS

    2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MINERALS

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    25.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    260.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observations (11)

DistanceCodeObservation
2DAGS
0AMHB 1184
261.6AMHB 1183
25.2CM
260.1DAZ
25.2H
260.1DAGS
260.1CM
0MWL
0MWM
2DAZMINERALS

Properties (6)

additional_info
SC378310
custom_field_two
2
customer
LACSD
datetime
2019-07-22T04:08:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false