Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 21, 2019, 08:50 AM
  • H 0490_H 0869_21082019_020050.mp4

Date
08/21/2019
W/O
776994
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00181
PipeID
P10916
Time
1:50 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6873
Sewer Name
H JOINT OUTFALL H - UNIT 6
City
BASSETT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_776994_TV15212_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
H 0490
Downstream MH
H 0869
Dir. of Survey
Downstream
Length Surveyed
37.7 ft.
Total Length
37.7 ft.
Structural Index
4
Structural Quick
5436
Structural Rating
38
O&M Index
2
O&M Quick
2600
O&M Rating
12
Overall Index
3
Overall Quick
Overall Rating
50
Pipe schematic from manhole H 0490 to H 0869
MH: H 0490MH: H 0869downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 04900 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start34.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish34.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish34.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish37.7 ft. AMH - Downstream Manhole, Survey Ends - H 086937.7 ft. MGO - General Observation - STOP LOG CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    12.7 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2DAGS
0MWL
37.7AMHH 0869
12.7SRV
2SAP
34.5SRV
34.5DAGS
34.5SAP
37.7MGOSTOP LOG CONNECTION AT MH 3 O'CLOCK
0AMHH 0490
0MWM

Properties (6)

additional_info
SC378343
custom_field_two
2
customer
LACSD
datetime
2019-08-21T01:50:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false