Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 8, 2017, 11:41 AM
  • 05 1358_05 1357 _11082017_034216.mp4

Date
11/08/2017
W/O
668908
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00444
PipeID
P06574
Time
3:41 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5213
Sewer Name
05 GARDENA PUMP TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
WO_668908_TV05031_NOV2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1357
Downstream MH
05 1358
Dir. of Survey
Upstream
Length Surveyed
330.1 ft.
Total Length
330.1 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
195
Pipe schematic from manhole 05 1357 to 05 1358
MH: 05 1357MH: 05 1358upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 13581.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish19.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"42.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"78.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"86.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"119.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6"160.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"221.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"272.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"324 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"328.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start330.1 ft. MWL - Water Level, 5 %of cross sectional area330.1 ft. AMH - Downstream Manhole, Survey Begins - 05 1357330.1 ft. MGO - General Observation - MAG COATING 50%

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
287.6TFC
57.3TFC
328.2SAP
330.1AMH05 1358
243.6TFA
0MWL
170TFA
251.6TFC
310.5TFC
0AMH05 1357
2SAP
0MGOMAG COATING 50%
211TF
6.1TFC
108.5TFC

Properties (6)

additional_info
SC346084
custom_field_two
2
customer
LACSD
datetime
2017-11-08T03:41:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false