05 1332A_05 1332 _11142017_022013.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
7.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 11 o'clock, , within 8 inches of joint: YES
7.2 ft. - Infiltration Dripper, at 11 o'clock, within 8 inches of joint: YES
37 ft. - Infiltration Dripper, from 10 to 03 o'clock, within 8 inches of joint: YES
110.6 ft. - Infiltration Runner, at 12 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 05 1332A |
| 37 | ID | — |
| 159.9 | DAGS | — |
| 159.9 | SAP | — |
| 100.4 | TB | — |
| 159.9 | AMH | 05 1332 |
| 0 | MWM | — |
| 7.2 | DAE | — |
| 0 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOCK |
| 110.6 | IR | — |
| 0 | MWL | — |
| 159.9 | MGO | ACTIVE CONNECTION AT MH 3 O'CLOCK |
| 2 | DAGS | — |
| 2 | SAP | — |
| 7.2 | ID | — |
| 114.2 | DSZ | DEBRIS |
| 159.9 | DSZ | — |