Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 8, 2017, 07:44 AM
  • 05 1360_05 1359 _11072017_234520.mp4

Date
11/07/2017
W/O
668908
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00444
PipeID
P06577
Time
11:44 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5213
Sewer Name
05 GARDENA PUMP TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
WO_668908_TV05031_NOV2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1359
Downstream MH
05 1360
Dir. of Survey
Upstream
Length Surveyed
370.4 ft.
Total Length
370.4 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
370
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
374
Pipe schematic from manhole 05 1359 to 05 1360
MH: 05 1359MH: 05 1360upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 13600.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish37.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"85.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"134 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"185.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"233.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"280.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"332.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"368.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start368.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start370.4 ft. AMH - Downstream Manhole, Survey Begins - 05 1359370.4 ft. MWM - Water Mark, 50 %of cross sectional area370.4 ft. MWL - Water Level, 50 %of cross sectional area

Observation photos (2)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
2SSS
137.1TFC
333.1TFA
370.2SSS
184.5TFA
236.4TFA
2SAP
89.6TFC
370.4AMH05 1360
0AMH05 1359
285.1TFA
0MWM
370.2SAP
0MWL
38.3TFA

Properties (6)

additional_info
SC346084
custom_field_two
2
customer
LACSD
datetime
2017-11-07T23:44:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false