Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 8, 2017, 08:10 AM
  • 05 1361_05 1360 _11082017_001036.mp4

Date
11/08/2017
W/O
668908
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00444
PipeID
P06578
Time
12:10 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5213
Sewer Name
05 GARDENA PUMP TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
WO_668908_TV05031_NOV2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1360
Downstream MH
05 1361
Dir. of Survey
Upstream
Length Surveyed
124.1 ft.
Total Length
124.1 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
120
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
124
Pipe schematic from manhole 05 1360 to 05 1361
MH: 05 1360MH: 05 1361upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 13611.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish4.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"54.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"103.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"120.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start122.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start124.1 ft. MWM - Water Mark, 50 %of cross sectional area124.1 ft. AMH - Downstream Manhole, Survey Begins - 05 1360124.1 ft. MWL - Water Level, 50 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
124.1AMH05 1361
0MWM
122.9SSS
120TFC
123SAP
0AMH05 1360
3.4SSS
0MWL
2SAP
69.8TFC
20.2TF

Properties (6)

additional_info
SC346084
custom_field_two
2
customer
LACSD
datetime
2017-11-08T00:10:19-08:00
documentation
PRO PIPE
is_lateral_inspection
false