Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 9, 2017, 07:53 AM
  • 05 1343_05 1342 _11082017_235416.mp4

Date
11/08/2017
W/O
668908
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00444
PipeID
P06560
Time
11:53 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5214
Sewer Name
05 GARDENA PUMP TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
WO_668908_TV05031_NOV2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1343
Downstream MH
05 1342
Dir. of Survey
Downstream
Length Surveyed
130 ft.
Total Length
130 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
75
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
3
Overall Quick
Overall Rating
125
Pipe schematic from manhole 05 1343 to 05 1342
MH: 05 1343MH: 05 1342downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 13430 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"69.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"95.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"118.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish128.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish130 ft. AMH - Downstream Manhole, Survey Ends - 05 1342

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
128.3SAP
83.5TBA
47TFC
128.3DAGS
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWM
69.9TFC
0AMH05 1343
118.8TFC
95.6TFC
2DAGS
130AMH05 1342
2SAP
0MWL

Properties (6)

additional_info
SC346085
custom_field_two
2
customer
LACSD
datetime
2017-11-08T23:53:43-08:00
documentation
PRO PIPE
is_lateral_inspection
false