Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 9, 2017, 06:55 AM
  • 05 1346_05 1345 _11082017_225555.mp4

Date
11/08/2017
W/O
668908
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00444
PipeID
P06563
Time
10:55 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5214
Sewer Name
05 GARDENA PUMP TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
WO_668908_TV05031_NOV2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1346
Downstream MH
05 1345
Dir. of Survey
Downstream
Length Surveyed
440.9 ft.
Total Length
440.9 ft.
Structural Index
3
Structural Quick
3P00
Structural Rating
261
O&M Index
2
O&M Quick
2a00
O&M Rating
342
Overall Index
2
Overall Quick
Overall Rating
603
Pipe schematic from manhole 05 1346 to 05 1345
MH: 05 1346MH: 05 1345downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 13460 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"20.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS48 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"55 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"88.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"144.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"149.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"153.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"160 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"196 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"214.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"237.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"263.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"268.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"273 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"326.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"332.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"361.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"375.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"381.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"438.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish438.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish438.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish440.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK440.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE440.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1345

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    20.7 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

Observations (33)

DistanceCodeObservation
438.7DSZ
160TFC
438.7DAGS
214.1TFA
361.3TFA
2SAP
326.7TFC
48TFA
0AMH05 1346
2DAGS
0MWM
101.1TFC
263.4TF
88.1TFC
440.9MGOACTIVE CONNECTION AT MH 3 O'CLOCK
440.9MGOCOCKROACHES IN MANHOLE
149.9TFC
237.2TF
332.3TFC
438.7SAP
381.1TFC
196TFC
375.6TF
153.2TFC
6TFC
268.1TFC
20.7DSZDEBRIS
273TF
0MGOCONNECTION AT MH 9 O'CLOCK
0MWL
440.9AMH05 1345
55TFC
144.6TFC

Properties (6)

additional_info
SC346085
custom_field_two
2
customer
LACSD
datetime
2017-11-08T22:55:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false