Section#14_B 0869_B 0868__9272019__I0253.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 50% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE
135.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
156.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT
522.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
534.8 ft. - General Observation - 80% MAG COAT
| Distance | Code | Observation |
|---|---|---|
| 2 | SAP | SEVERE AGG |
| 616.1 | SSS | BLISTERING FLAKING CONCRETE |
| 2 | MGO | MAG COAT 50% START |
| 616.1 | MGO | MAG COAT 80% FINISH |
| 156.7 | SAP | SEVERE AGG UNDER MAG COAT |
| 534.8 | MGO | 80% MAG COAT |
| 522.1 | SAP | SEVERE AGG |
| 616.1 | SAP | SEVERE AGG |
| 0 | AMH | 4:10AM |
| 135.6 | SAP | SEVERE AGG |
| 321.4 | MWM | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 2 | SSS | BLISTERING FLAKING CONCRETE |
| 616.1 | AMH | 4:45AM |
| 123.2 | MWM | — |