Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 27, 2019, 08:21 AM
  • Section#12_B 0870_B 0485__9272019__I0253.mp4

Date
09/27/2019
W/O
0787705
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00098
PipeID
P09028
Time
1:21 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0253
Sewer Name
B JOINT OUTFALL B - UNIT 6D
City
ROSEMEAD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20190924MDM_JOINT_OUTFALL_B_UNIT_6D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
B 0870
Downstream MH
B 0485
Dir. of Survey
Downstream
Length Surveyed
195.8 ft.
Total Length
195.8 ft.
Structural Index
2
Structural Quick
3G2G
Structural Rating
197
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
197
Pipe schematic from manhole B 0870 to B 0485
MH: B 0870MH: B 0485downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:45AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE2 ft. MGO - General Observation - 30% MAG COAT START65 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING FLAKING CONCRETE195.3 ft. MGO - General Observation - 30% MAG COAT FINISH195.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING FLAKING CONCRETE195.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG VERY SPORATIC195.8 ft. AMH - Downstream Manhole, Survey Ends - 2:05AM

Observation photos (4)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE

  • General Observation - 30% MAG COAT START

    2 ft. - General Observation - 30% MAG COAT START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING FLAKING CONCRETE

    65 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING FLAKING CONCRETE

Observations (11)

DistanceCodeObservation
195.3MGO30% MAG COAT FINISH
65SSSBLISTERING FLAKING CONCRETE
195.3SSSBLISTERING FLAKING CONCRETE
0AMH1:45AM
2SAVSEVERE AGG SPORATIC
195.8AMH2:05AM
0MWM
2SSSBLISTERING FLAKING CONCRETE
195.3SAVSEVERE AGG VERY SPORATIC
0MWL
2MGO30% MAG COAT START

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2019-09-27T01:21:04-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false