Section#4_B 0488_B 0875__9242019__I0250.mp4
2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2.1 ft. - General Observation - 36'' NRCP
10.1 ft. - Surface Aggregate Missing, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG
34.1 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
42.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE
68.5 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
300.7 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG
424.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 473.7 | SAM | SEVERE AGG |
| 10.1 | SAM | SEVERE AGG |
| 34.1 | SAM | SEVERE AGG |
| 0 | MWL | — |
| 0 | AMH | 5:05AM |
| 42.5 | SSS | BLISTERING CONCRETE |
| 414.1 | MWM | — |
| 2 | SAM | SEVERE AGG |
| 0 | MWM | — |
| 2.1 | MGO | 36'' NRCP |
| 68.5 | SAM | SEVERE AGG |
| 424.8 | SAM | SEVERE AGG |
| 300.7 | SAM | SEVERE AGG |
| 473.9 | AMH | 5:30AM |
| 1 | MGO | MH IS A FLOW CONTROL MH |
| 473.7 | SSS | BLISTERING CONCRETE |