D 0067_D 0066_9202019_122233.mp4
0 ft. - Upstream Manhole, Survey Begins - 11:59 AM
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
126.3 ft. - General Photograph
300.7 ft. - General Photograph
319.9 ft. - General Photograph
403.3 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 2 | SRV | — |
| 300.7 | MGP | — |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 472.1 | SAP | — |
| 403.3 | MGP | — |
| 2 | SSS | — |
| 474 | AMH | 1:23 PM |
| 2 | SAP | — |
| 471.9 | SAV | — |
| 474 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 471.9 | SSS | — |
| 2 | SZ | 65% MAG |
| 0 | AMH | 11:59 AM |
| 474 | MGO | Peeling & Flaking Throughout The Reach |
| 472 | SRV | — |
| 472.1 | SZ | 65% MAG |
| 0 | MWM | — |
| 0 | MWL | — |
| 319.9 | MGP | — |
| 2 | SAV | — |
| 126.3 | MGP | — |