D 0077_D 0076_9182019_100701.mp4
0 ft. - Upstream Manhole, Survey Begins - 9:03 AM
0 ft. - General Observation - Conn. @ Mh, 3 O' Clock. Active
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
45.5 ft. - General Photograph
103.1 ft. - General Observation - ABANDONED MH
148.7 ft. - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"
204.8 ft. - General Photograph
218.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
218.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 0.1 | MWM | — |
| 218.6 | SRV | — |
| 220.2 | MWL | — |
| 220.2 | MGO | Grease Throughout The Reach (5%) |
| 2 | SSS | — |
| 218.6 | SSS | — |
| 0 | AMH | 9:03 AM |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 103.1 | MGO | ABANDONED MH |
| 218.6 | SAV | — |
| 2 | SRV | — |
| 2 | SZ | 75% MAG |
| 220.2 | AMH | 10:33 AM |
| 204.8 | MGP | — |
| 148.7 | TFA | — |
| 2 | SAV | — |
| 220.2 | MGO | Peeling & Flaking Throughout The Reach |
| 218.6 | SZ | 75% MAG |
| 45.5 | MGP | — |