Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 2, 2019, 07:39 AM
  • Section#1_B 1396_B 1395__1022019__I0259R.mp4

Date
10/02/2019
W/O
0792526
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01126
PipeID
P25108
Time
12:39 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0259R
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
04
Purpose
Maintenance Related
Project
20191002MDM_JOINT_OUTFALL_B_UNIT_6J
Material
Vitrified Clay Pipe
Shape
Circular
Height
20 in.
Upstream MH
B 1396
Downstream MH
B 1395
Dir. of Survey
Downstream
Length Surveyed
210.2 ft.
Total Length
210.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3421
O&M Rating
19
Overall Index
2
Overall Quick
Overall Rating
19
Pipe schematic from manhole B 1396 to B 1395
MH: B 1396MH: B 1395downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area7.9 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 3%27.3 ft. RFJ - Roots Fine Joint, from 01 to 04 o'clock, within 8 inches of joint: YESR - 4%32.4 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 5 %, within 8 inches of joint: YESR35.1 ft. TBD - Tap Break-In Defective, at 01 o'clock, -, , within 8 inches of joint: YES, 6" - ACTIVE 25% ROOTS37 ft. RMJ - Roots Medium Joint, from 09 to 11 o'clock, 10 %, within 8 inches of joint: YESR37 ft. TBD - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: YES, 6", 6" - ACTIVE 90% ROOTS38.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN40.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN50.4 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 2%81.8 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 1%87.9 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-95%ROOTS92.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN114.5 ft. MGO - General Observation - VCP CORRISON141.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB144.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - STUB178 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN196 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - STUB210.2 ft. AMH - Downstream Manhole, Survey Ends - 1:10AM

Observation photos (3)

  • Roots Medium Joint, from 09 to 11 o'clock, 10 %, within 8 inches of joint: YESR

    37 ft. - Roots Medium Joint, from 09 to 11 o'clock, 10 %, within 8 inches of joint: YESR

  • Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-95%ROOTS

    87.9 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN-95%ROOTS

  • General Observation - VCP CORRISON

    114.5 ft. - General Observation - VCP CORRISON

Observations (21)

DistanceCodeObservation
196TFCSTUB
0AMH12:45AM
81.8RFJ1%
141.5TFCSTUB
38.5TFOPEN
27.3RFJ4%
37RMJ
210.2AMH1:10AM
92.2TFOPEN
87.9TFDOPEN-95%ROOTS
37TBDACTIVE 90% ROOTS
35.1TBDACTIVE 25% ROOTS
0MWL
50.4RFJ2%
40.8TFOPEN
7.9RFJ3%
32.4RMJ
144.5TFCSTUB
178TBOPEN
114.5MGOVCP CORRISON
0MWL

Properties (5)

additional_info
POST ROOT EVALUATION ONLY
customer
LACSD
datetime
2019-10-02T00:39:08-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false