Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 21, 2019, 06:43 AM
  • H JOINT_H 0610 _20082019_235020.mp4

Date
08/20/2019
W/O
777332
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00190
PipeID
P20357
Time
11:43 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6872
Sewer Name
H JOINT OUTFALL H - UNIT 8G
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_777332_TV15075_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
H JOINT
Downstream MH
H 0610
Dir. of Survey
Downstream
Length Surveyed
94.8 ft.
Total Length
94.8 ft.
Structural Index
3
Structural Quick
3C00
Structural Rating
57
O&M Index
2
O&M Quick
2C00
O&M Rating
38
Overall Index
3
Overall Quick
Overall Rating
95
Pipe schematic from manhole H JOINT to H 0610
MH: H JOINTMH: H 0610downstream0 ft. AMH - Upstream Manhole, Survey Begins - H JOINT0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - MAG COATING THROUGHOUT.0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start93 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish93 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish94.8 ft. AMH - Downstream Manhole, Survey Ends - H 0610

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    0 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT.

    0 ft. - General Observation - MAG COATING THROUGHOUT.

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
93DAGS
0AMHH JOINT
93SAP
0SAP
0MWM
0MGOMAG COATING THROUGHOUT.
94.8AMHH 0610
0MWL
0DAGS

Properties (7)

additional_info
SC378342
custom_field_two
3
customer
LACSD
datetime
2019-08-20T23:43:01-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
27198