Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 21, 2019, 07:26 AM
  • H 0607_H 0606 _21082019_003642.mp4

Date
08/21/2019
W/O
777332
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00190
PipeID
P11028
Time
12:26 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6872
Sewer Name
H JOINT OUTFALL H - UNIT 8G
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_777332_TV15075_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
H 0607
Downstream MH
H 0606
Dir. of Survey
Downstream
Length Surveyed
221.4 ft.
Total Length
221.4 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
220
O&M Index
2
O&M Quick
2H00
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
308
Pipe schematic from manhole H 0607 to H 0606
MH: H 0607MH: H 0606downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06070 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start76.7 ft. MGO - General Observation - MAG COATING THROUGHOUT 40%221.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish221.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE221.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish221.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish221.4 ft. AMH - Downstream Manhole, Survey Ends - H 0606

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    221.4 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (12)

DistanceCodeObservation
2SAP
0AMHH 0607
76.7MGOMAG COATING THROUGHOUT 40%
2DAGS
221.4SAP
2SSS
0MWL
221.4MGOCOCKROACHES IN MANHOLE
221.4DAGS
221.4SSS
0MWM
221.4AMHH 0606

Properties (7)

additional_info
SC378342
custom_field_two
3
customer
LACSD
datetime
2019-08-21T00:26:19-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
27198