Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 30, 2019, 05:20 AM
  • H 0443_H 1372_29072019_223309.mp4

Date
07/29/2019
W/O
777336
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00180
PipeID
P26181
Time
10:20 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6648
Sewer Name
H JOINT OUTFALL H - UNIT 5D
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_777336_TV15113_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0443
Downstream MH
H 1372
Dir. of Survey
Downstream
Length Surveyed
32.3 ft.
Total Length
32.3 ft.
Structural Index
3
Structural Quick
3624
Structural Rating
26
O&M Index
2
O&M Quick
2600
O&M Rating
12
Overall Index
2
Overall Quick
Overall Rating
38
Pipe schematic from manhole H 0443 to H 1372
MH: H 0443MH: H 1372downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 04430 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT 50%2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start9.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish30.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish30.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish32.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK32.3 ft. AMH - Downstream Manhole, Survey Ends - H 1372

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
30.5DAGS
0MWL
0MWM
2DAGS
30.5SAP
30.5SSS
0AMHH 0443
32.3MGOACTIVE CONNECTION AT MH 3 AND 9 O'CLOCK
2MGOMAG COATING THROUGHOUT 50%
2SAP
32.3AMHH 1372
9.8SSS
0MGOCOCKROACHES IN MANHOLE

Properties (6)

additional_info
SC378315
custom_field_two
3
customer
LACSD
datetime
2019-07-29T22:20:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false