Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 25, 2019, 09:35 AM
  • H 0442_15 0913_25072019_024759.mp4

Date
07/25/2019
W/O
777336
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00180
PipeID
P21371
Time
2:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6646
Sewer Name
H JOINT OUTFALL H - UNIT 5D
City
SOUTH EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_777336_TV15113_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0442
Downstream MH
15 0913
Dir. of Survey
Downstream
Length Surveyed
38.5 ft.
Total Length
38.5 ft.
Structural Index
3
Structural Quick
3727
Structural Rating
35
O&M Index
2
O&M Quick
2A00
O&M Rating
22
Overall Index
2
Overall Quick
Overall Rating
57
Pipe schematic from manhole H 0442 to 15 0913
MH: H 0442MH: 15 0913downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 04420 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start17.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS37 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish37 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish37 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish37 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish38.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE38.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK38.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK38.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0913

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    38.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (16)

DistanceCodeObservation
0AMHH 0442
17.4DSZDEBRIS
37SSS
38.5MGOCOCKROACHES IN MANHOLE
2DAGS
37DSZ
2SSS
0MGOCOCKROACHES IN MANHOLE
38.5MGOACTIVE CONNECTION AT MH 3 O'CLOCK
37DAGS
0MWM
38.5MGOACTIVE CONNECTION AT MH 9 O'CLOCK
38.5AMH15 0913
37SAP
2SAP
0MWL

Properties (6)

additional_info
SC378313
custom_field_two
3
customer
LACSD
datetime
2019-07-25T02:35:59-07:00
documentation
PRO PIPE
is_lateral_inspection
false