Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 25, 2019, 08:56 AM
  • H 0454_H 0453_25072019_020920.mp4

Date
07/25/2019
W/O
777336
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00180
PipeID
P10906
Time
1:56 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6646
Sewer Name
H JOINT OUTFALL H - UNIT 5D
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_777336_TV15113_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 0453
Downstream MH
H 0454
Dir. of Survey
Upstream
Length Surveyed
340.5 ft.
Total Length
340.5 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
201
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
3
Overall Quick
Overall Rating
335
Pipe schematic from manhole H 0453 to H 0454
MH: H 0453MH: H 0454upstream0 ft. AMH - Upstream Manhole, Survey Ends - H 04540 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK1.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish94.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"105.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"143.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"165.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"247.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"252.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"296.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"334.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start334.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"338.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start340.5 ft. AMH - Downstream Manhole, Survey Begins - H 0453340.5 ft. MWL - Water Level, 15 %of cross sectional area340.5 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    340.5 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
2DAGS
338.9DAGS
0AMHH 0453
88.3TFA
43.8TFC
5.6SAP
175.1TFA
340.5AMHH 0454
235.1TFA
340.5MGOCOCKROACHES IN MANHOLE
245.6TFC
338.9SAP
93.2TFA
0MWL
5.6TFA
197TFA
0MWM
340.5MGOACTIVE CONNECTION AT MH 9 O'CLOCK

Properties (6)

additional_info
SC378313
custom_field_two
3
customer
LACSD
datetime
2019-07-25T01:56:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false