Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 25, 2019, 07:09 AM
  • H 0450_H 0449_25072019_002540.mp4

Date
07/25/2019
W/O
777336
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00180
PipeID
P10902
Time
12:09 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6646
Sewer Name
H JOINT OUTFALL H - UNIT 5D
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_777336_TV15113_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
H 0450
Downstream MH
H 0449
Dir. of Survey
Downstream
Length Surveyed
284.6 ft.
Total Length
284.6 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
280
O&M Index
2
O&M Quick
2T00
O&M Rating
206
Overall Index
2
Overall Quick
Overall Rating
486
Pipe schematic from manhole H 0450 to H 0449
MH: H 0450MH: H 0449downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - H 04502 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start3.1 ft. MGO - General Observation - MAG COATING THROUGHOUT 50%26.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"45.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS64.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"166.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"190.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"224.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"282 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish282 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish282 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish282 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish284.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE284.6 ft. AMH - Downstream Manhole, Survey Ends - H 0449284.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    284.6 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (24)

DistanceCodeObservation
282SAP
166.6TFA
284.6MGOCOCKROACHES IN MANHOLE
0MWL
284.6AMHH 0449
26.6TFA
116.3TFA
0MWM
282SSS
282DSZ
282DAGS
0MGOCOCKROACHES IN MANHOLE
3SSS
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
64.6TFA
2DAGS
45.2DSZDEBRIS
284.6MGOACTIVE CONNECTION AT MH 3 O'CLOCK
3.1MGOMAG COATING THROUGHOUT 50%
3SAP
224.5TFA
190.3TFC
104.3TFA
0AMHH 0450

Properties (6)

additional_info
SC378313
custom_field_two
3
customer
LACSD
datetime
2019-07-25T00:09:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false