Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 25, 2019, 07:37 AM
  • H 0448_H 0447_25072019_004912.mp4

Date
07/25/2019
W/O
777336
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00180
PipeID
P10900
Time
12:37 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6646
Sewer Name
H JOINT OUTFALL H - UNIT 5D
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_777336_TV15113_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0448
Downstream MH
H 0447
Dir. of Survey
Downstream
Length Surveyed
212.3 ft.
Total Length
212.3 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
205
O&M Index
2
O&M Quick
2G00
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
289
Pipe schematic from manhole H 0448 to H 0447
MH: H 0448MH: H 0447downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 04480 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start3.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start37 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"53.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"93.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.8 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"132.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"142.1 ft. MGO - General Observation - MAG COATING THROUGHOUT 40%210.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish210.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish210.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish212.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK212.3 ft. AMH - Downstream Manhole, Survey Ends - H 0447212.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    212.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (18)

DistanceCodeObservation
212.3MGOCONNECTION AT MH 3 O'CLOCK
2DAGS
142.1MGOMAG COATING THROUGHOUT 40%
210.4DAGS
210.4SSS
117.8TFA
210.4SAP
93.2TBA
0AMHH 0448
3.3SAP
0MWM
212.3AMHH 0447
37TFA
212.3MGOCOCKROACHES IN MANHOLE
0MWL
5.1SSS
53.8TFC
132.1TFA

Properties (6)

additional_info
SC378313
custom_field_two
3
customer
LACSD
datetime
2019-07-25T00:37:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false