Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 29, 2019, 09:21 AM
  • H 0444_H 0443_29072019_023433.mp4

Date
07/29/2019
W/O
777336
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00180
PipeID
P10898
Time
2:21 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6647
Sewer Name
H JOINT OUTFALL H - UNIT 5D
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_777336_TV15113_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0444
Downstream MH
H 0443
Dir. of Survey
Downstream
Length Surveyed
317.4 ft.
Total Length
317.4 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
436
Pipe schematic from manhole H 0444 to H 0443
MH: H 0444MH: H 0443downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 04440 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"13.7 ft. MGO - General Observation - MAG COATING THROUGHOUT 40%314.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish314.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish316.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE317.4 ft. AMH - Downstream Manhole, Survey Ends - H 0443

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    316.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (14)

DistanceCodeObservation
314.9SSS
0MWM
317.4AMHH 0443
9.6TBA
2.5SSS
2.5SAP
314.9DAGS
314.9SAP
13.7MGOMAG COATING THROUGHOUT 40%
2DAGS
0AMHH 0444
0MWL
0MGOCOCKROACHES IN MANHOLE
316.1MGOCOCKROACHES IN MANHOLE

Properties (6)

additional_info
SC378314
custom_field_two
3
customer
LACSD
datetime
2019-07-29T02:21:19-07:00
documentation
PRO PIPE
is_lateral_inspection
false