Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 24, 2019, 06:55 AM
  • H 0435_H 0434_24072019_001350.mp4

Date
07/23/2019
W/O
777336
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00180
PipeID
P10890
Time
11:55 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6645
Sewer Name
H JOINT OUTFALL H - UNIT 5D
City
SOUTH EL MONTE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_777336_TV15113_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
H 0435
Downstream MH
H 0434
Dir. of Survey
Downstream
Length Surveyed
105.7 ft.
Total Length
105.7 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
100
O&M Index
3
O&M Quick
413C
O&M Rating
101
Overall Index
3
Overall Quick
Overall Rating
201
Pipe schematic from manhole H 0435 to H 0434
MH: H 0435MH: H 0434downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - H 04350 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start8.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS104.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish104.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish104.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish104.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish105.7 ft. AMH - Downstream Manhole, Survey Ends - H 0434105.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    105.7 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (15)

DistanceCodeObservation
0MWM
0MGOCOCKROACHES IN MANHOLE
104.1SAP
104.1SSS
105.7AMHH 0434
8.9DSZDEBRIS
0AMHH 0435
2DAGS
0MWL
2SSS
104.1DSZ
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2SAP
105.7MGOCOCKROACHES IN MANHOLE
104.1DAGS

Properties (6)

additional_info
SC378312
custom_field_two
3
customer
LACSD
datetime
2019-07-23T23:55:44-07:00
documentation
PRO PIPE
is_lateral_inspection
false