Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 24, 2019, 09:58 AM
  • 01 0268_01 0267_24062019_031649.mp4

Date
06/24/2019
W/O
771921
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00218
PipeID
P01316
Time
2:58 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5588
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_771921_TV01204_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
01 0268
Downstream MH
01 0267
Dir. of Survey
Downstream
Length Surveyed
332.7 ft.
Total Length
332.7 ft.
Structural Index
3
Structural Quick
533L
Structural Rating
210
O&M Index
2
O&M Quick
4135
O&M Rating
284
Overall Index
2
Overall Quick
Overall Rating
494
Pipe schematic from manhole 01 0268 to 01 0267
MH: 01 0268MH: 01 0267downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02680 ft. VC - Vermin Cockroach0 ft. MGO - General Observation - CONNECTION IN MH AT 9 AND 3 OCLOCK2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS31.7 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIS85.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"149.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"179.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"209.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"242.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"271.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"309 ft. B - Broken, from 10 to 02 o'clock, within 8 inches of joint: YES312 ft. B - Broken, from 09 to 03 o'clock, within 8 inches of joint: YES315 ft. B - Broken, from 09 to 03 o'clock, within 8 inches of joint: YES329 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish330.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish330.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish332.7 ft. AMH - Downstream Manhole, Survey Ends - 01 0267332.7 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK ACTIVE332.7 ft. MGO - General Observation - CONNECTION IN MH 9 OCLOCK CAPPED

Observation photos (4)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    7.4 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

Observations (25)

DistanceCodeObservation
332.7AMH01 0267
31.7DSZDEBRIS
0MWM
330.1DAGS
0MWL
149.3TF
329CM
242.7TFC
209.8TF
312B
309B
271.9TFC
4CM
2DAE
330.1DAE
0AMH01 0268
315B
332.7MGOCONNECTION IN MH 3 OCLOCK ACTIVE
0VC
332.7MGOCONNECTION IN MH 9 OCLOCK CAPPED
179.2TF
7.4DSZDEBRIS
2DAGS
0MGOCONNECTION IN MH AT 9 AND 3 OCLOCK
85.4TFC

Properties (6)

additional_info
SC377545
custom_field_two
2
customer
LACSD
datetime
2019-06-24T02:58:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false