Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 24, 2019, 10:18 AM
  • 01 0267_01 0266B_24062019_032621.mp4

Date
06/24/2019
W/O
771921
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00218
PipeID
P01315
Time
3:18 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5588
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_771921_TV01204_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
01 0267
Downstream MH
01 0266B
Dir. of Survey
Downstream
Length Surveyed
62 ft.
Total Length
62 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
55
O&M Index
2
O&M Quick
2C11
O&M Rating
45
Overall Index
2
Overall Quick
Overall Rating
100
Pipe schematic from manhole 01 0267 to 01 0266B
MH: 01 0267MH: 01 0266Bdownstream0 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 01 02670 ft. MGO - General Observation - CONNECTION IN MH 9 OCLOCK CAPPED0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start59 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish59 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish59 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish59 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish60 ft. VC - Vermin Cockroach62 ft. AMH - Downstream Manhole, Survey Ends - 01 0266B62 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK ACTIVE

Observation photos (4)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
59DAE
2.9SSS
0MGOCONNECTION IN MH 3 OCLOCK ACTIVE
0AMH01 0267
2.2DAGS
2.2DAE
59SSS
59CM
0MGOCONNECTION IN MH 9 OCLOCK CAPPED
60VC
59DAGS
4.3CM
62AMH01 0266B
0MWM
62MGOCONNECTION IN MH 3 OCLOCK ACTIVE
0MWL

Properties (6)

additional_info
SC377545
custom_field_two
3
customer
LACSD
datetime
2019-06-24T03:18:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false