Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2019, 05:37 AM
  • 01 0252_01 0251_24062019_232536.mp4

Date
06/24/2019
W/O
771921
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00218
PipeID
P01297
Time
10:37 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5587
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_771921_TV01204_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0252
Downstream MH
01 0251
Dir. of Survey
Downstream
Length Surveyed
318.9 ft.
Total Length
318.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2L12
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
128
Pipe schematic from manhole 01 0252 to 01 0251
MH: 01 0252MH: 01 0251downstream0 ft. MGO - General Observation - CIP LINER0 ft. MGO - General Observation - CONNECTION IN MH 9 OCLOCK ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02520 ft. VC - Vermin Cockroach2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start129.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"153.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"204 ft. RFL - Roots Fine Lateral, from 11 to 12 o'clock - from lateral at 12 oclock, 5%204.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" - ROOTS INSIDE, 15%255.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"316.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish318.9 ft. AMH - Downstream Manhole, Survey Ends - 01 0251318.9 ft. MGO - General Observation - CONNECTION IN MH AT 9 AND 3 OCLOCK ACTIVE

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
153.9TFA
2.1DAGS
316.8DAGS
204RFLfrom lateral at 12 oclock, 5%
0MGOCIP LINER
204.5TFAROOTS INSIDE, 15%
318.9AMH01 0251
255.8TF
0MGOCONNECTION IN MH 9 OCLOCK ACTIVE
0MWM
129.7TF
0MWL
0AMH01 0252
0VC
318.9MGOCONNECTION IN MH AT 9 AND 3 OCLOCK ACTIVE

Properties (7)

additional_info
SC377546
custom_field_two
3
customer
LACSD
datetime
2019-06-24T22:37:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIP LINER