Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2019, 06:44 AM
  • 01 0250_01 0249_25062019_000150.mp4

Date
06/24/2019
W/O
771921
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00218
PipeID
P01295
Time
11:44 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5587
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_771921_TV01204_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0250
Downstream MH
01 0249
Dir. of Survey
Downstream
Length Surveyed
350.9 ft.
Total Length
350.9 ft.
Structural Index
3
Structural Quick
3D21
Structural Rating
71
O&M Index
2
O&M Quick
2[11
O&M Rating
277
Overall Index
2
Overall Quick
Overall Rating
348
Pipe schematic from manhole 01 0250 to 01 0249
MH: 01 0250MH: 01 0249downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 02500 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION IN MH AT 9 AND 3 OCLOCK ACTIVE0 ft. VC - Vermin Cockroach2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start4.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start68 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"94.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"115.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish121.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"146.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"157.5 ft. CS - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES173.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"196.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"223.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"247.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"253.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES270.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"297.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"324.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"348.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"349.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish349.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish350.9 ft. AMH - Downstream Manhole, Survey Ends - 01 0249350.9 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK CAPPED

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

    157.5 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    253.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (27)

DistanceCodeObservation
157.5CS
348.5TF
2.7DAE
350.9AMH01 0249
0AMH01 0250
247.5TF
349.2DAGS
146.3TFC
0MWL
2.6DAGS
0MWM
0MGOCONNECTION IN MH AT 9 AND 3 OCLOCK ACTIVE
324.6TFC
94.9TF
297.5TFC
196.4TFC
121.6TFC
68TFC
350.9MGOCONNECTION IN MH 3 OCLOCK CAPPED
349.2DAE
223.2TFC
0VC
115.6CM
4.8CM
253.5CM
270.7TFC
173.7TFC

Properties (6)

additional_info
SC377546
custom_field_two
3
customer
LACSD
datetime
2019-06-24T23:44:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false