Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 18, 2019, 10:27 AM
  • 22 1067_22 1066 _18072019_034208.mp4

Date
07/18/2019
W/O
776941
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00812
PipeID
P17438
Time
3:27 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6766
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_776941_TV22043_JUL2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1067
Downstream MH
22 1066
Dir. of Survey
Downstream
Length Surveyed
309.9 ft.
Total Length
309.9 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
412K
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
433
Pipe schematic from manhole 22 1067 to 22 1066
MH: 22 1067MH: 22 1066downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK/OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 22 10670 ft. VC - Vermin Cockroach0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK/OPEN2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"87.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"237.1 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN246.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN307 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG308 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish308 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - @ MH308 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish308.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309.9 ft. AMH - Downstream Manhole, Survey Ends - 22 1066

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
87.6TFC
2.9DAGS
0MWL
0MWM
308SSS
2SZ65% MAG
237.1TBOPEN
2.9SSS
309.9AMH22 1066
0MGOCONNECTION AT MH 3 O'CLOCK/OPEN
0AMH22 1067
308VC@ MH
0VC
35.1TFC
0MGOCONNECTION AT MH 9 O'CLOCK/OPEN
2.9SAP
308SAP
307SZ65% MAG
246.8TBOPEN
308.9DAGS

Properties (6)

additional_info
SC378271
custom_field_two
3
customer
LACSD
datetime
2019-07-18T03:27:10-07:00
documentation
PRO PIPE
is_lateral_inspection
false