Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2019, 09:58 AM
  • 22 1062_22 1061 _22072019_031654.mp4

Date
07/22/2019
W/O
776941
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00812
PipeID
P17433
Time
2:58 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6767
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_776941_TV22043_JUL2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1062
Downstream MH
22 1061
Dir. of Survey
Downstream
Length Surveyed
278 ft.
Total Length
278 ft.
Structural Index
3
Structural Quick
513J
Structural Rating
275
O&M Index
2
O&M Quick
2J11
O&M Rating
109
Overall Index
2
Overall Quick
Overall Rating
384
Pipe schematic from manhole 22 1062 to 22 1061
MH: 22 1062MH: 22 1061downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK/OPEN0 ft. VC - Vermin Cockroach0 ft. B - Broken, from 04 to 08 o'clock, within 8 inches of joint: NO - CHANNEL BROKEN AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 22 10620 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK/OPEN2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG3.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start53.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN102.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN151.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"203.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN252.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN275.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish275.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish275.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish276 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG278 ft. AMH - Downstream Manhole, Survey Ends - 22 1061

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
0MGOCONNECTION AT MH 3 O'CLOCK/OPEN
275.4SAP
278AMH22 1061
0VC
0BCHANNEL BROKEN AT MH
0AMH22 1062
252.6TFOPEN
3.8SAP
151.2TFC
3.8SSS
0MWL
3.8DAGS
2SZ65% MAG
0MWM
53.4TFOPEN
276SZ65% MAG
203.9TFOPEN
102.3TFOPEN
275.4SSS
0MGOCONNECTION AT MH 9 O'CLOCK/OPEN
275.4DAGS

Properties (6)

additional_info
SC378272
custom_field_two
3
customer
LACSD
datetime
2019-07-22T02:58:36-07:00
documentation
PRO PIPE
is_lateral_inspection
false