Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 29, 2019, 08:25 PM
  • H 0695_H 0694_07292019_133931.mp4

Date
07/29/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00941
PipeID
P11102
Time
1:25 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6770
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
INDUSTRY
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0694
Downstream MH
H 0695
Dir. of Survey
Upstream
Length Surveyed
666.9 ft.
Total Length
666.9 ft.
Structural Index
3
Structural Quick
3t00
Structural Rating
798
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
802
Pipe schematic from manhole H 0694 to H 0695
MH: H 0694MH: H 0695upstream0 ft. MSA - Survey Abandoned - DEBRIS0 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIS0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish664.7 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH664.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start664.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start666.9 ft. MWL - Water Level, 40 %of cross sectional area666.9 ft. AMH - Downstream Manhole, Survey Begins - H 0694666.9 ft. MGO - General Observation - REVERSAL666.9 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (3)

  • General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

    2.2 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2.2MGOMAGNEZIUM H.O COATING THROUGHOUT REACH
666.9MSADEBRIS
0MWL
0AMHH 0694
666.9DSZDEBRIS
0MGOREVERSAL
2.2SAP
666.9SAP
0MWM
2.2SAP
666.9SAP

Properties (6)

additional_info
SC378276
custom_field_two
3
customer
LACSD
datetime
2019-07-29T13:25:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false