Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 30, 2019, 04:52 PM
  • H 0699_H 0698_07302019_095248.mp4

Date
07/30/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00941
PipeID
P11106
Time
9:52 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6771
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
EL MONTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0699
Downstream MH
H 0698
Dir. of Survey
Downstream
Length Surveyed
682.7 ft.
Total Length
682.7 ft.
Structural Index
3
Structural Quick
3Z2Z
Structural Rating
680
O&M Index
2
O&M Quick
2Z00
O&M Rating
272
Overall Index
2
Overall Quick
Overall Rating
952
Pipe schematic from manhole H 0699 to H 0698
MH: H 0699MH: H 0698downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06990 ft. MWL - Water Level, 25 %of cross sectional area1.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start1.9 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH1.9 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start1.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start680.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish680.6 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish680.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish682.7 ft. AMH - Downstream Manhole, Survey Ends - H 0698

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    1.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

    1.9 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWM
680.6DAGS
1.9DAGS
682.7AMHH 0698
0AMHH 0699
680.6SAP
680.6SSS
1.9MGOMAGNEZIUM H.O COATING THROUGHOUT REACH
1.9SAP
0MWL
1.9SSS

Properties (6)

additional_info
SC378277
custom_field_two
3
customer
LACSD
datetime
2019-07-30T09:52:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false