Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 13, 2019, 08:45 AM
  • H 0698_H 0697_061319_014539.mp4

Date
06/13/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00941
PipeID
P11105
Time
1:45 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6564
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0697
Downstream MH
H 0698
Dir. of Survey
Upstream
Length Surveyed
541 ft.
Total Length
541 ft.
Structural Index
3
Structural Quick
3T2T
Structural Rating
535
O&M Index
2
O&M Quick
4131
O&M Rating
222
Overall Index
2
Overall Quick
Overall Rating
757
Pipe schematic from manhole H 0697 to H 0698
MH: H 0697MH: H 0698upstream0 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MCU - Camera Underwater0 ft. MSA - Survey Abandoned - FLIPPED DUE TO DEBRIS5 ft. DSC - Deposits Settled Compacted, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO397.6 ft. MWL - Water Level, 50 %of cross sectional area495.8 ft. LR - Alignment Right, 5 %535.5 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start536.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start536.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start541 ft. MWL - Water Level, 35 %of cross sectional area541 ft. MWM - Water Mark, 40 %of cross sectional area541 ft. AMH - Downstream Manhole, Survey Begins - H 0697

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
143.4MWL
541DSC
4.5SAP
541SSS
536DSC
0MWL
0MWM
0AMHH 0697
541SAP
541MCU
45.2LR
4.5SSS
541MSAFLIPPED DUE TO DEBRIS
5.5DSC

Properties (6)

additional_info
SC377688
custom_field_two
2
customer
LACSD
datetime
2019-06-13T01:45:00-07:00
documentation
PROPIPE
is_lateral_inspection
false