Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 20, 2019, 05:58 AM
  • H 0695_H 0694_19062019_22582626.mp4

Date
06/19/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00941
PipeID
P11102
Time
10:58 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5591
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
INDUSTRY
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0695
Downstream MH
H 0694
Dir. of Survey
Downstream
Length Surveyed
70.2 ft.
Total Length
70.2 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
3
O&M Quick
4221
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole H 0695 to H 0694
MH: H 0695MH: H 0694downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06951.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start37.2 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area48 ft. MCU - Camera Underwater70 ft. MSA - Survey Abandoned - DEBRIS70 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish70.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish70.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish70.2 ft. DSZ - Deposits Settled Other, 25 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - DEBRIS

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    1.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
70.2DAGS
0MWM
1.7SAP
48MCU
70.1SAP
70MSADEBRIS
1.7SSS
70.2DSZDEBRIS
0MWL
37.2MWLS
1.7DAGS
70SSS
0AMHH 0695

Properties (6)

additional_info
SC377542
custom_field_two
3
customer
LACSD
datetime
2019-06-19T22:58:24-07:00
documentation
PRO PIPE
is_lateral_inspection
false