Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 31, 2019, 06:12 PM
  • H 0689_H 0688_07312019_111319.mp4

Date
07/31/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00941
PipeID
P11096
Time
11:12 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6772
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
EL MONTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0688
Downstream MH
H 0689
Dir. of Survey
Upstream
Length Surveyed
487.4 ft.
Total Length
487.4 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
485
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
485
Pipe schematic from manhole H 0688 to H 0689
MH: H 0688MH: H 0689upstream0 ft. AMH - Upstream Manhole, Survey Ends - H 06892.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish486.1 ft. MGO - General Observation - MAG COATING THROUGHOUT REACH486.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start486.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start487.4 ft. AMH - Downstream Manhole, Survey Begins - H 0688487.4 ft. MWM - Water Mark, 45 %of cross sectional area487.4 ft. MWL - Water Level, 45 %of cross sectional area

Observation photos (3)

  • General Observation - MAG COATING THROUGHOUT REACH

    1.3 ft. - General Observation - MAG COATING THROUGHOUT REACH

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
487.4AMHH 0689
485.1SAP
0AMHH 0688
0MWM
1.3MGOMAG COATING THROUGHOUT REACH
0MWL
485.1SSS
1.3SSS
1.3SAP

Properties (6)

additional_info
SC378278
custom_field_two
3
customer
LACSD
datetime
2019-07-31T11:12:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false