Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 7, 2019, 05:19 AM
  • H 0678_H 0677_08062019_222024.mp4

Date
08/06/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00941
PipeID
P11085
Time
10:19 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6734
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0678
Downstream MH
H 0677
Dir. of Survey
Downstream
Length Surveyed
274.9 ft.
Total Length
274.9 ft.
Structural Index
1
Structural Quick
2H1J
Structural Rating
139
O&M Index
2
O&M Quick
2H00
O&M Rating
88
Overall Index
2
Overall Quick
Overall Rating
227
Pipe schematic from manhole H 0678 to H 0677
MH: H 0678MH: H 0677downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06780 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area6.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"9.1 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start54.4 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start58.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start262.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 18"274.9 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish274.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish274.9 ft. MGO - General Observation - LINE APPEARS TO BE SIPHON274.9 ft. MSA - Survey Abandoned - UNABLE TO CONTINUE DUE TO DROP274.9 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9.1 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    58.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
274.9DSC
9.1SRI
0AMHH 0678
274.9SSS
274.9MGOLINE APPEARS TO BE SIPHON
54.4DSC
58.2SSS
0MWL
6.8TFC
274.9MSAUNABLE TO CONTINUE DUE TO DROP
0MWM
262.1TFC
274.9SRI

Properties (6)

additional_info
SC378233
custom_field_two
5
customer
LACSD
datetime
2019-08-06T22:19:45-07:00
documentation
PROPIPE
is_lateral_inspection
false