Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 8, 2019, 09:20 AM
  • H 0673_H 0672_08082019_022136.mp4

Date
08/08/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. BUENROPSTRO
Sewer ID
Z00941
PipeID
P11080
Time
2:20 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6738
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0672
Downstream MH
H 0673
Dir. of Survey
Upstream
Length Surveyed
594.8 ft.
Total Length
594.8 ft.
Structural Index
2
Structural Quick
332W
Structural Rating
245
O&M Index
2
O&M Quick
362V
O&M Rating
244
Overall Index
2
Overall Quick
Overall Rating
489
Pipe schematic from manhole H 0672 to H 0673
MH: H 0672MH: H 0673upstream0 ft. AMH - Upstream Manhole, Survey Ends - H 06730.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.4 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish12 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start58.8 ft. MGP - General Photograph - SPALLING213.5 ft. DSC - Deposits Settled Compacted, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish242.6 ft. DSC - Deposits Settled Compacted, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start472.5 ft. SAV - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO565.9 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start590.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start590.3 ft. MGO - General Observation - MAG COATING ATTATCHED594.8 ft. MWM - Water Mark, 35 %of cross sectional area594.8 ft. MWL - Water Level, 30 %of cross sectional area594.8 ft. AMH - Downstream Manhole, Survey Begins - H 0672

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO

    122.3 ft. - Surface Aggregate Visible, from 02 to 04 o'clock, within 8 inches of joint: NO

  • General Photograph - SPALLING

    536 ft. - General Photograph - SPALLING

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    582.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
582.8SAP
122.3SAV
594.4SSS
594.8AMHH 0673
0MWM
28.9DSC
0MWL
381.3DSC
352.2DSC
4.5SSS
0AMHH 0672
594.4SAP
594.4DSC
536MGPSPALLING
4.5MGOMAG COATING ATTATCHED

Properties (6)

additional_info
SC378237
custom_field_two
2
customer
LACSD
datetime
2019-08-08T02:20:29-07:00
documentation
PROPIPE
is_lateral_inspection
false