- Date
- 08/08/2019
- W/O
- 766531
- Weather
- Dry
- Operator/Surveyor
- J. BUENROSTRO
- Sewer ID
- Z00941
- PipeID
- P11079
- Time
- 3:11 AM
- Certificate
- U-715-07000770
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K6738
- Sewer Name
- H JOINT OUTFALL H - UNIT 9B
- City
- PICO RIVERA
- Loc. details
- Parking Lot
- Location Code
- G
- Use of Sewer
- Sanitary Sewer
- District
- District 18
- Page No.
- 03
- Purpose
- Routine Assessment
- Project
- WO_766531_TV18175_MAY2019
- Sewer Type
- Gravity
- Material
- NRCP
- Shape
- Circular
- Height
- 25 in.
- Width
- 25 in.
- Upstream MH
- H 0672
- Downstream MH
- H 0671
- Dir. of Survey
- Downstream
- Length Surveyed
- 988.7 ft.
- Total Length
- 988.7 ft.
- Structural Index
- 2
- Structural Quick
- 2f00
- Structural Rating
- 390
- O&M Index
- 2
- O&M Quick
- 2…00
- O&M Rating
- 698
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 1088
Pipe schematic from manhole H 0672 to H 0671 Observation photos (3)

4.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

4.5 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

11.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start