Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 1, 2019, 06:29 PM
  • H 0669_H 0668_08012019_112945.mp4

Date
08/01/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00941
PipeID
P11076
Time
11:29 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6773
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0669
Downstream MH
H 0668
Dir. of Survey
Downstream
Length Surveyed
385.1 ft.
Total Length
385.1 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
385
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
385
Pipe schematic from manhole H 0669 to H 0668
MH: H 0669MH: H 0668downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06690 ft. MWL - Water Level, 40 %of cross sectional area1.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH385 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish385 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish385.1 ft. AMH - Downstream Manhole, Survey Ends - H 0668

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

    2.1 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

Observations (9)

DistanceCodeObservation
385SSS
2.1SSS
385SAP
1.9SAP
0MWM
2.1MGOMAGNEZIUM H.O COATING THROUGHOUT REACH
385.1AMHH 0668
0AMHH 0669
0MWL

Properties (5)

additional_info
SC378279
customer
LACSD
datetime
2019-08-01T11:29:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false