Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 2, 2019, 06:56 PM
  • H 0665_H 0664 _08022019_120224.mp4

Date
08/02/2019
W/O
766531
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00941
PipeID
P11072
Time
11:56 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6776
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
WO_766531_TV18175_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
28 in.
Width
28 in.
Upstream MH
H 0665
Downstream MH
H 0664
Dir. of Survey
Downstream
Length Surveyed
502 ft.
Total Length
502 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
495
O&M Index
2
O&M Quick
3C2S
O&M Rating
262
Overall Index
2
Overall Quick
Overall Rating
757
Pipe schematic from manhole H 0665 to H 0664
MH: H 0665MH: H 0664downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06652 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT REACH2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.7 ft. VC - Vermin Cockroach395.4 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS498.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish498.6 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIS498.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish498.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish502 ft. AMH - Downstream Manhole, Survey Ends - H 0664

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT REACH

    2 ft. - General Observation - MAG COATING THROUGHOUT REACH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWM
0MWL
2SSS
2DAGS
502AMHH 0664
395.4DSZDEBRIS
2MGOMAG COATING THROUGHOUT REACH
498.6SSS
498.6DSZDEBRIS
42.7VC
498.6DAGS
0AMHH 0665
498.6SAP
2SAP

Properties (6)

additional_info
SC378282
custom_field_two
3
customer
LACSD
datetime
2019-08-02T11:56:09-07:00
documentation
PRO PIPE
is_lateral_inspection
false