Section#1_D 0073_D 0072__9192019__I0244.mp4
0 ft. - Upstream Manhole, Survey Begins - 9:00 A.M.
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
20.1 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
43.3 ft. - General Photograph
69.2 ft. - General Photograph
100.5 ft. - General Photograph
152.3 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 0.1 | MWL | — |
| 0.1 | SAV | — |
| 160.3 | SZ | 45% MAG |
| 135.8 | TFC | — |
| 160.3 | SSS | — |
| 160.3 | MGO | ACTIVE CONN. @ MH 9 O'CLOCK & 3 O'CLOCK |
| 2 | SSS | — |
| 160.3 | MGO | GREASE THROUGHOUT REACH 5% |
| 160.3 | SAV | — |
| 152.3 | MGP | — |
| 161.4 | AMH | 10:45 |
| 20.1 | SRC | — |
| 2 | SZ | 45% MAG |
| 69.2 | MGP | — |
| 100.5 | MGP | — |
| 160.3 | SRC | — |
| 0.1 | MWM | — |
| 2 | SAV | — |
| 43.3 | MGP | — |
| 0 | AMH | 9:00 A.M. |