Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2019, 04:00 PM
  • Section#1_D 0073_D 0072__9192019__I0244.mp4

Date
09/19/2019
W/O
0792816
Weather
Dry
Operator/Surveyor
SHADLER
Sewer ID
Z00154
PipeID
P09973
Time
9:00 AM
Certificate
U-415-06024035
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0244
Sewer Name
D JOINT OUTFALL D - UNIT 4
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20190919KS_D_JOINT_OUTFALL_D_UNIT_4
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
D 0073
Downstream MH
D 0072
Dir. of Survey
Downstream
Length Surveyed
161.4 ft.
Total Length
161.4 ft.
Structural Index
3
Structural Quick
5E3F
Structural Rating
303
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
303
Pipe schematic from manhole D 0073 to D 0072
MH: D 0073MH: D 0072downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:00 A.M.0.1 ft. MWL - Water Level, 20 %of cross sectional area0.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES0.1 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start20.1 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.3 ft. MGP - General Photograph69.2 ft. MGP - General Photograph100.5 ft. MGP - General Photograph135.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"152.3 ft. MGP - General Photograph160.3 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 45% MAG160.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish160.3 ft. MGO - General Observation - ACTIVE CONN. @ MH 9 O'CLOCK & 3 O'CLOCK160.3 ft. MGO - General Observation - GREASE THROUGHOUT REACH 5%160.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish160.3 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish161.4 ft. AMH - Downstream Manhole, Survey Ends - 10:45

Observation photos (9)

  • Upstream Manhole, Survey Begins - 9:00 A.M.

    0 ft. - Upstream Manhole, Survey Begins - 9:00 A.M.

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.1 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    43.3 ft. - General Photograph

  • General Photograph

    69.2 ft. - General Photograph

  • General Photograph

    100.5 ft. - General Photograph

  • General Photograph

    152.3 ft. - General Photograph

Observations (20)

DistanceCodeObservation
0.1MWL
0.1SAV
160.3SZ45% MAG
135.8TFC
160.3SSS
160.3MGOACTIVE CONN. @ MH 9 O'CLOCK & 3 O'CLOCK
2SSS
160.3MGOGREASE THROUGHOUT REACH 5%
160.3SAV
152.3MGP
161.4AMH10:45
20.1SRC
2SZ45% MAG
69.2MGP
100.5MGP
160.3SRC
0.1MWM
2SAV
43.3MGP
0AMH9:00 A.M.

Properties (4)

customer
LACSD
datetime
2019-09-19T09:00:00-07:00
documentation
SHADLER, FRANKLIN, IGNACIO, BRAR
is_lateral_inspection
false