Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2019, 10:01 AM
  • 01 0260_01 0259_25062019_031418.mp4

Date
06/25/2019
W/O
771921
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00218
PipeID
P01306
Time
3:01 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5587
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_771921_TV01204_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 0260
Downstream MH
01 0259
Dir. of Survey
Downstream
Length Surveyed
323.1 ft.
Total Length
323.1 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
317
O&M Index
2
O&M Quick
412e
O&M Rating
387
Overall Index
2
Overall Quick
Overall Rating
704
Pipe schematic from manhole 01 0260 to 01 0259
MH: 01 0260MH: 01 0259downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02600 ft. VC - Vermin Cockroach0 ft. MGO - General Observation - CONNECTION IN MH 3 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start101 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN142.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN181.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"217.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN259.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"317 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish318.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish320.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish321 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish322 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish323.1 ft. AMH - Downstream Manhole, Survey Ends - 01 0259323.1 ft. MGO - General Observation - CONNECTION IN MH 3 O'CLOCK/ACTIVE

Observation photos (3)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
2.7DAE
0MWL
4CM
0AMH01 0260
321DAGS
101TFOPEN
2.7DAGS
317DAR
217.8TFOPEN
2DAR
318.6CM
0VC
322SSS
323.1AMH01 0259
323.1MGOCONNECTION IN MH 3 O'CLOCK/ACTIVE
142.9TFOPEN
2SSS
259.2TFA
320.9DAE
181.2TFC
0MGOCONNECTION IN MH 3 O'CLOCK/ACTIVE
0MWM

Properties (6)

additional_info
SC377546
custom_field_two
4
customer
LACSD
datetime
2019-06-25T03:01:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false