D 0075_D 0074_9182019_120339.mp4
0 ft. - Upstream Manhole, Survey Begins - 11:20 AM
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
47.1 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
72.8 ft. - General Photograph
78.4 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 2 | SRV | — |
| 161.4 | MGO | Conn. @ Mh, 3 O' Clock. ACTIVE |
| 2 | SSS | — |
| 159.8 | MGO | Peeling & Flaking Throughout The Reach |
| 0 | MWM | — |
| 159.8 | SRV | — |
| 78.4 | MGP | — |
| 159.8 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 0 | MWL | — |
| 159.8 | SAP | — |
| 163.5 | AMH | 12:25 PM |
| 47.1 | SRC | — |
| 2 | SAP | — |
| 72.8 | MGP | — |
| 159.8 | SRC | — |
| 159.8 | SSS | — |
| 0 | AMH | 11:20 AM |