Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 16, 2019, 07:03 AM
  • 02 0006_02 0005A_16072019_001302.mp4

Date
07/16/2019
W/O
771913
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00234
PipeID
P03032
Time
12:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6634
Sewer Name
02 ARTESIA EXTENSION TRUNK
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
RFIR_WO_771913_TV02341_JUN2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
02 0006
Downstream MH
02 0005A
Dir. of Survey
Downstream
Length Surveyed
285.2 ft.
Total Length
285.2 ft.
Structural Index
4
Structural Quick
4J31
Structural Rating
223
O&M Index
2
O&M Quick
3H2J
O&M Rating
250
Overall Index
3
Overall Quick
Overall Rating
473
Pipe schematic from manhole 02 0006 to 02 0005A
MH: 02 0006MH: 02 0005Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 00060 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES8.9 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start46.8 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES47.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"60.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS117.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"193.8 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 6"197.2 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"245.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"283.8 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish283.8 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish283.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish285.2 ft. AMH - Downstream Manhole, Survey Ends - 02 0005A

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    4.2 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.9 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 15 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    46.8 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
0AMH02 0006
60.4DSZDEBRIS
283.8FM
4.2CM
197.2TBA
193.8TBA
46.8DAGS
117.5TFA
0MWL
47.4TFA
0MWM
283.8DSZ
245.2TFC
2DAGS
283.8DAGS
285.2AMH02 0005A
8.9FM

Properties (6)

additional_info
SC378301
custom_field_two
2
customer
LACSD
datetime
2019-07-16T00:03:12-07:00
documentation
PRO PIPE
is_lateral_inspection
false