Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 18, 2019, 08:18 AM
  • H 1282_H 1281 _18072019_012445.mp4

Date
07/18/2019
W/O
771786
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01183
PipeID
P17298
Time
1:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6638
Sewer Name
H JOINT OUTFALL H - UNIT 8L
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
11
Purpose
Routine Assessment
Project
WO_771786_TV22004_JUN2019
Sewer Type
Siphon
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
H 1281
Downstream MH
H 1282
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole H 1281 to H 1282
MH: H 1281MH: H 1282upstream0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES0 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES0 ft. MSA - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.2 ft. MWL - Water Level, 50 %of cross sectional area2 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. AMH - Downstream Manhole, Survey Begins - H 1281

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.

    2 ft. - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.

Observations (6)

DistanceCodeObservation
0MWL
2SAP
2SSS
2MSAVIEW OF UPLEG OF D/S SIPHON.
0MWM
0AMHH 1281

Properties (6)

additional_info
SC378305
custom_field_two
2
customer
LACSD
datetime
2019-07-18T01:18:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false