Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 12, 2019, 10:03 AM
  • Section#5_02 1145_02 1144__9122019__I0232.mp4

Date
09/12/2019
W/O
0787613
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00351
PipeID
P02929
Time
3:03 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0232
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
13
Purpose
Maintenance Related
Project
20190911MDM_GARFIELD_AVENUE_EXTENSION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
02 1145
Downstream MH
02 1144
Dir. of Survey
Downstream
Length Surveyed
225.8 ft.
Total Length
225.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 02 1145 to 02 1144
MH: 02 1145MH: 02 1144downstream0 ft. MGO - General Observation - MH CONN 3:00 STUB0 ft. MGO - General Observation - MH CONN 9:00 STUB0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:05AM0 ft. MWL - Water Level, 5 %of cross sectional area7.9 ft. MGO - General Observation - 12" VCP27.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN102.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - STUB153.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - STUB201.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - STUB215 ft. DAGS - Deposits Attached Grease, 3 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start225.5 ft. DAGS - Deposits Attached Grease, 3 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish225.5 ft. MGO - General Observation - MH CONN 3:00 OPEN225.8 ft. AMH - Downstream Manhole, Survey Ends - 3:25AM

Observation photos (2)

  • General Observation - 12" VCP

    7.9 ft. - General Observation - 12" VCP

  • Deposits Attached Grease, 3 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    215 ft. - Deposits Attached Grease, 3 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
153.7TFCSTUB
0MGOMH CONN 3:00 STUB
0MGOMH CONN 9:00 STUB
225.5DAGS
201.6TFCSTUB
225.5MGOMH CONN 3:00 OPEN
7.9MGO12" VCP
225.8AMH3:25AM
0MWM
215DAGS
27.9TFOPEN
102.9TFCSTUB
0AMH3:05AM
0MWL

Properties (5)

additional_info
PRE CLEANING INSPECTION ONLY
customer
LACSD
datetime
2019-09-12T03:03:43-07:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection
false