Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 12, 2019, 08:45 AM
  • Section#4_02 1146_02 1145__9122019__I0232.mp4

Date
09/12/2019
W/O
0787613
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00351
PipeID
P02930
Time
1:45 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0232
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
13
Purpose
Maintenance Related
Project
20190911MDM_GARFIELD_AVENUE_EXTENSION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
02 1146
Downstream MH
02 1145
Dir. of Survey
Downstream
Length Surveyed
319.8 ft.
Total Length
319.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 02 1146 to 02 1145
MH: 02 1146MH: 02 1145downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:50AM0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - MH CONN 3:00 OPEN8.3 ft. MGO - General Observation - 12" VCP57.2 ft. DAGS - Deposits Attached Grease, 3 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO57.2 ft. MWM - Water Mark, 50 %of cross sectional area319.5 ft. MGO - General Observation - MH CONN 3:00 STUB319.5 ft. MGO - General Observation - MH CONN 9:00 STUB319.8 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (2)

  • General Observation - 12" VCP

    8.3 ft. - General Observation - 12" VCP

  • Deposits Attached Grease, 3 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO

    57.2 ft. - Deposits Attached Grease, 3 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO

Observations (10)

DistanceCodeObservation
0MWM
319.5MGOMH CONN 3:00 STUB
57.2DAGS
319.8AMH2:15AM
0AMH1:50AM
57.2MWM
0MWL
8.3MGO12" VCP
319.5MGOMH CONN 9:00 STUB
0MGOMH CONN 3:00 OPEN

Properties (5)

additional_info
PRE CLEANING INSPECTION ONLY
customer
LACSD
datetime
2019-09-12T01:45:27-07:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection
false