Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 11, 2019, 11:31 AM
  • Section#20_01 0207_01 0206__9112019__I0233.mp4

Date
09/11/2019
W/O
0787675
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00202
PipeID
P01249
Time
4:31 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0233
Sewer Name
01 COMPTON AVENUE TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
06
Purpose
Capital Improvement Program Assesment
Project
20190905MDM_COMPTON_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
01 0207
Downstream MH
01 0206
Dir. of Survey
Downstream
Length Surveyed
349.9 ft.
Total Length
349.9 ft.
Structural Index
2
Structural Quick
382M
Structural Rating
162
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
163
Pipe schematic from manhole 01 0207 to 01 0206
MH: 01 0207MH: 01 0206downstream0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 4:40AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MAG COAT 50% START17.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE17.1 ft. MWM - Water Mark, 40 %of cross sectional area17.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - FLAKING17.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG17.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG28.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG39.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN54.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN105.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN109.8 ft. RFJ - Roots Fine Joint, from 08 to 12 o'clock, within 8 inches of joint: YESR - 3%110.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN131.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN149 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE154.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG204.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE218.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN266.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE272.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN275 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN318.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG326.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE339.6 ft. MGO - General Observation - MAG COAT FINISH349.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG349.5 ft. MGO - General Observation - MH CONN 9:00 ACTIVE349.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - FLAKING CONCRETE349.9 ft. AMH - Downstream Manhole, Survey Ends - 5:20AM

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 50% START

    2 ft. - General Observation - MAG COAT 50% START

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    17.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    28.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    154.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    318.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (33)

DistanceCodeObservation
39.1TFOPEN
218.2TFOPEN
131.1TFOPEN
349.9AMH5:20AM
275TFOPEN
204.2TFACTIVE
17.1SSSFLAKING CONCRETE
318.6SAPSEVERE AGG
349.5SAPSEVERE AGG
28.4SAPSEVERE AGG
326.3TFACTIVE
17.1MWM
0MGOMH CONN 9:00 ACTIVE
110.8TFOPEN
17.1SSSFLAKING
349.5MGOMH CONN 9:00 ACTIVE
272.2TFOPEN
2SSSFLAKING CONCRETE
149TFACTIVE
2SAPSEVERE AGG
0AMH4:40AM
109.8RFJ3%
0MWM
17.1SAPSEVERE AGG
17.1SAPSEVERE AGG
349.5SSSFLAKING CONCRETE
266.8TFACTIVE
154.8SAPSEVERE AGG
105.6TFOPEN
2MGOMAG COAT 50% START
339.6MGOMAG COAT FINISH
54.4TFOPEN
0MWL

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2019-09-11T04:31:00-07:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection