Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 11, 2019, 09:58 AM
  • Section#18_01 0209_01 0208__9112019__I0233.mp4

Date
09/11/2019
W/O
0787675
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00202
PipeID
P01251
Time
2:58 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0233
Sewer Name
01 COMPTON AVENUE TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
06
Purpose
Capital Improvement Program Assesment
Project
20190905MDM_COMPTON_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
01 0209
Downstream MH
01 0208
Dir. of Survey
Downstream
Length Surveyed
200.7 ft.
Total Length
200.7 ft.
Structural Index
2
Structural Quick
3G2G
Structural Rating
194
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
194
Pipe schematic from manhole 01 0209 to 01 0208
MH: 01 0209MH: 01 0208downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MWM - Water Mark, 40 %of cross sectional area - FLAKING2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start15.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG28.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN43.1 ft. MGP - General Photograph - MAG COAT 10%58.6 ft. MGO - General Observation - MAG COAT 30% START69.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN113.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN118.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN141.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN157 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE158.8 ft. MGO - General Observation - MAG COAT 60% START167.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN200.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - FLAKING CONCRETE200.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG200.2 ft. MGO - General Observation - MAG COAT 60% FINISH200.7 ft. AMH - Downstream Manhole, Survey Ends - 3:40AM

Observation photos (5)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    15.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Photograph - MAG COAT 10%

    43.1 ft. - General Photograph - MAG COAT 10%

  • General Observation - MAG COAT 60% START

    158.8 ft. - General Observation - MAG COAT 60% START

Observations (21)

DistanceCodeObservation
0AMH3:15AM
200.2SSSFLAKING CONCRETE
0MGOMH CONN 9:00 ACTIVE
200.2SAPSEVERE AGG
157TFACTIVE
58.6MGOMAG COAT 30% START
15.1SAPSEVERE AGG
69.1TFOPEN
0MWL
2MWMFLAKING
28.1TFOPEN
43.1MGPMAG COAT 10%
200.7AMH3:40AM
158.8MGOMAG COAT 60% START
118.3TFOPEN
113.2TFOPEN
141.6TFOPEN
2SAVSEVERE AGG
2SSS
200.2MGOMAG COAT 60% FINISH
167.1TFOPEN

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2019-09-11T02:58:44-07:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection
false