Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 6, 2019, 06:26 PM
  • 15 0853_15 0852_962019_112834.mp4

Date
09/06/2019
W/O
0788181
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00594
PipeID
P12631
Time
11:26 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Jetting
Media Label
G8072
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 3&2A
City
SIERRA MADRE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
01
Purpose
Maintenance Related
Project
20190905DF_ARCADIA_SIERRA_MADRE_TRUNK_SECTS_3_2A
Material
NRCP
Shape
Circular
Height
8.399999618530273 in.
Upstream MH
15 0853
Downstream MH
15 0852
Dir. of Survey
Downstream
Length Surveyed
209.3 ft.
Total Length
209.3 ft.
Structural Index
3
Structural Quick
3A00
Structural Rating
30
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
32
Pipe schematic from manhole 15 0853 to 15 0852
MH: 15 0853MH: 15 0852downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:27 AM49.2 ft. LFBU - Lining Failure Bulges, from 11 to 01 o'clock, within 8 inches of joint: YES50.4 ft. LFBU - Lining Failure Bulges, from 01 to 04 o'clock, within 8 inches of joint: YES, Start50.4 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open/70% GREASE-ROOTS53.3 ft. MGP - General Photograph55.6 ft. MGP - General Photograph55.6 ft. LFBU - Lining Failure Bulges, from 01 to 04 o'clock, within 8 inches of joint: YES, Finish67.1 ft. LFBU - Lining Failure Bulges, from 10 to 12 o'clock, within 8 inches of joint: YES, Start70.8 ft. LFBU - Lining Failure Bulges, from 10 to 12 o'clock, within 8 inches of joint: YES, Finish72.3 ft. MGP - General Photograph72.3 ft. LFBU - Lining Failure Bulges, from 12 to 04 o'clock, within 8 inches of joint: YES, Start76.5 ft. MGP - General Photograph79.9 ft. LFBU - Lining Failure Bulges, from 08 to 10 o'clock, within 8 inches of joint: YES, Start79.9 ft. LFBU - Lining Failure Bulges, from 12 to 04 o'clock, within 8 inches of joint: YES, Finish82.7 ft. MGP - General Photograph89.7 ft. LFBU - Lining Failure Bulges, from 08 to 10 o'clock, within 8 inches of joint: YES, Finish90.9 ft. LFBU - Lining Failure Bulges, from 12 to 04 o'clock, within 8 inches of joint: YES, Start93.7 ft. LFBU - Lining Failure Bulges, from 08 to 12 o'clock, within 8 inches of joint: YES, Start94.8 ft. LFBU - Lining Failure Bulges, from 12 to 04 o'clock, within 8 inches of joint: YES, Finish96.6 ft. MGP - General Photograph98.1 ft. LFBU - Lining Failure Bulges, from 10 to 04 o'clock, within 8 inches of joint: YES, Start99.1 ft. MGP - General Photograph101.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open105.7 ft. LFBU - Lining Failure Bulges, from 08 to 12 o'clock, within 8 inches of joint: YES, Finish107.3 ft. MGP - General Photograph115.5 ft. MGP - General Photograph118.8 ft. LFBU - Lining Failure Bulges, from 10 to 04 o'clock, within 8 inches of joint: YES, Finish120.4 ft. LFBU - Lining Failure Bulges, from 08 to 11 o'clock, within 8 inches of joint: YES206 ft. LFBU - Lining Failure Bulges, from 08 to 04 o'clock, within 8 inches of joint: YES206.8 ft. MGP - General Photograph209.3 ft. AMH - Downstream Manhole, Survey Ends - 11:57 AM209.3 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)

Observation photos (20)

  • Upstream Manhole, Survey Begins - 11:27 AM

    0 ft. - Upstream Manhole, Survey Begins - 11:27 AM

  • Lining Failure Bulges, from 11 to 01 o'clock, within 8 inches of joint: YES

    49.2 ft. - Lining Failure Bulges, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Lining Failure Bulges, from 01 to 04 o'clock, within 8 inches of joint: YES, Start

    50.4 ft. - Lining Failure Bulges, from 01 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open/70% GREASE-ROOTS

    50.4 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open/70% GREASE-ROOTS

  • General Photograph

    53.3 ft. - General Photograph

  • General Photograph

    55.6 ft. - General Photograph

  • Lining Failure Bulges, from 10 to 12 o'clock, within 8 inches of joint: YES, Start

    67.1 ft. - Lining Failure Bulges, from 10 to 12 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    72.3 ft. - General Photograph

  • General Photograph

    76.5 ft. - General Photograph

  • Lining Failure Bulges, from 08 to 10 o'clock, within 8 inches of joint: YES, Start

    79.9 ft. - Lining Failure Bulges, from 08 to 10 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    82.7 ft. - General Photograph

  • Lining Failure Bulges, from 12 to 04 o'clock, within 8 inches of joint: YES, Start

    90.9 ft. - Lining Failure Bulges, from 12 to 04 o'clock, within 8 inches of joint: YES, Start

  • Lining Failure Bulges, from 08 to 12 o'clock, within 8 inches of joint: YES, Start

    93.7 ft. - Lining Failure Bulges, from 08 to 12 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    96.6 ft. - General Photograph

  • General Photograph

    99.1 ft. - General Photograph

  • General Photograph

    107.3 ft. - General Photograph

  • General Photograph

    115.5 ft. - General Photograph

  • Lining Failure Bulges, from 08 to 11 o'clock, within 8 inches of joint: YES

    120.4 ft. - Lining Failure Bulges, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Lining Failure Bulges, from 08 to 04 o'clock, within 8 inches of joint: YES

    206 ft. - Lining Failure Bulges, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph

    206.8 ft. - General Photograph

Observations (35)

DistanceCodeObservation
49.2LFBU
98.1LFBU
120.4LFBU
55.6MGP
89.7LFBU
53.3MGP
209.3AMH11:57 AM
55.6LFBU
99.1MGP
105.7LFBU
79.9LFBU
90.9LFBU
72.3MGP
0MGOConn. @ Mh, 9 O' Clock. Capped
118.8LFBU
76.5MGP
0MWM
209.3MGOGREASE THROUGHOUT THE REACH (5%)
72.3LFBU
79.9LFBU
206.8MGP
0MWL
94.8LFBU
101.4TFOpen
115.5MGP
96.6MGP
0AMH11:27 AM
50.4LFBU
70.8LFBU
50.4TFDOpen/70% GREASE-ROOTS
93.7LFBU
82.7MGP
107.3MGP
67.1LFBU
206LFBU

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-09-06T11:26:59-07:00
documentation
FRANKLIN, CASTILLO, IGNACIO
is_lateral_inspection
false